Maintaining baselines
that create a smooth and safe surface can be challenging. The photos below
outline the process of adding new material to baselines. This leveling process
will work on any baseball surface. Keep in mind, if leveling with a board,
address all “lips” before grading.
Step 1 Edge the sod to
create clean edges (address any “lips” as well). Then, add infield mix to the
baselines and, using a 2x4 screed board, level the next material.
Step 2 Till the new material into the existing material. Ideally, the tilling depth is 3-4 inches. In this example, Dura Edge Pro was added/tilled to existing Dura Edge Pro baselines.
Step 3 Re-screed the tilled material.
Step 4 Using a 3 ton dual drum roller, roll the baselines.
Step 5 Add conditioner
and drag.
This entire project for both baselines took approximately 3 hours.
Now the baselines are
level and create smooth transitions between the turf and the infield mix.
Play on!
--Jamie
Download the Smart Turf Sheet - How to: Add New Mix and Level Baselines
The original post can be viewed here.