Back to Central Region Little League......
The project is coming along nicely. We have managed to dodge the rain. The first photo below shows the initial installation of a french drain that will run along the entire outfield perimeter of the warning track, right outside the new fence. The drain will be able to remove 15+ inches of rain in 24 hours.
The next two photos show the initial laser grading of the rootzone and sub base for the new infield mix
The infield is graded at .5% using a conical laser and the outfield is graded at 1%. There is no subsurface drainage on the playing surface.
To see the first two blog posts on this project, click HERE and HERE
Go to j-dturf.com to learn more about J&D Turf.
Play on!
--Jamie