J&D Turf worked with Greensburg High School to complete the design, engineering and installation process for their new backstop wall, net, and padding.

The goals were the following:

  • Improved slight lines.
  • Improved protection for fans by increasing the net height between the dugout to 25 ft.
  • Overall, a better look for the field.

Here are a few photos:

The backstop before:




The backstop before the wall padding was added.  Notice the bottom of the net was stretched and laced to fit using coated twine:





The finished product:




The Pirates now have a netting system that will last, and improved slight lines and safety for all spectators.

Go to j-dturf.com to learn more about J&D Turf.