Compacting the sand sub base and finishing the clay brick install.
Beginning to install the Dura Edge Pro
Compacting the first 2 inch lift of Dura Edge Pro
The plate was completed after lightly working up the compacted material, with a final two inch lift of material and compacted.
A question I get frequently is, "How do I level my material in tight spaces such as plates and cutouts?" Well, here is a photo of leveling the 3rd base cutout at The Cove.
In this case we used the base anchor which was set via laser and the edge of the cutouts.
Finally, a couple of additional photos of The Cove. The stadium was renovated in 2011.
A special thanks to Head Groundskeeper, Joel Reinebold. Best of luck in 2012.
To learn more about Coveleski Stadium, click HERE.
To learn more about DuraEdge products, click HERE.
Go to j-dturf.com to learn more about J&D Turf.
Play on!
--Jamie