O'Bannon Park was sodded June 5-6, 2013. To see the first to posts from this project, click HERE and HERE.
The following photos were taken Sunday June 9, 2013. (My assistant is checking the shear strength on the sod)
As you can see the sod is beginning to root and establish. The fields were kept lean at the Post Road site. A starter was applied pre-sod and additional fertilizer will be applied after substantial rooting takes place (next 2-3 weeks). The fields will be aerified and topdressed this fall. Look for additional posts on this project throughout the summer and fall.